25 Oct 2016
15:15 UTC
Sam Smith
At approximately 15:50 BST access switch 1 in rack 22 was rebooted.
This was due to data centre maintenance taking place within the rack which caused the power cable to become unintentionally disconnected.
The switch is now back online and functioning as expected.