BigV uk0 outage

Expected resolution: 4 Nov 2016, 03:30 UTC
Return to issues
Issue status: Resolved Date:

4 Nov 2016
03:26 UTC

Posted by:

Bytemark Engineer

All heads have been reconnected to the brain and normal status should have resumed. Please contact support if you notice any ongoing issues from here on.

Issue status: Investigating Date:

4 Nov 2016
03:06 UTC

Posted by:

Bytemark Engineer

Servers on another head (head55) will have been rebooted, most affected heads are now reconnected to the brain and should be controllable to the panel now, two heads remain unconnected.

Issue status: Investigating Date:

4 Nov 2016
02:34 UTC

Posted by:

Bytemark Engineer

Machines that were previously offline due to this issue should now be back online or coming back online. Affected servers that can not be operated on through the control panel are still experiencing an issue that we are working to resolve.

Issue status: Investigating Date:

4 Nov 2016
02:15 UTC

Posted by:

Nat Lasseter

As a result of the errors made during the Core router replacement, the York BigV heads have become disconnected from the brains which control them.

A small number of machines have also gone down, but for all it will not currently be possible to restart or change them through the panel.

We're working to resolve this ASAP.